Construction estimating

Bids built on what actually won.

Drop in your plans and describe the job. Get a bid-ready estimate priced by models trained on successful bids and signed off by a working estimator.

Riverside Dental — Tenant Improvement
Commercial tenant improvement · 3,200 SF · Bellevue, WA
Sample estimate
Estimated total
$576,843
Cost per SF
$180/SF
Confidence
±6%
09
Finishes
$111,801
26
Electrical
$70,470
23
HVAC
$63,150
06
Wood, Plastics & Composites
$60,240
22
Plumbing
$55,600
01
General Requirements
$42,780
+ 8 more divisions, 39 line items, assumptions and exclusions in the full estimate

A sample estimate summary. Your estimate arrives as a full line-item PDF and an editable spreadsheet.

Four steps. One bid-ready number.

We confirm your files within one business day. Most estimates arrive three business days after that, or 24 hours with rush.

STEP 1

Upload your plans.

Drawings, specs, addenda, geotech, site photos. Upload the set or share a link to your plan room.

PDFDWGPhotosXLSX
STEP 2

Describe the job.

Scope, exclusions, site conditions, bid due date, and the number you're hoping to hit. Pay by card when you submit.

STEP 3

We build the estimate.

The model takes off quantities and prices them against comparable winning bids. An estimator reviews every line before it's released.

STEP 4

Get it by email.

Your estimate arrives as a bid-ready PDF and an editable spreadsheet, ready to drop into your bid.

PDFCSV

AI does the takeoff. A person signs the estimate.

Most AI estimating tools guess from price books. Ours learns from bids that actually won, then puts an estimator between the model and your name.

The model

Trained on winning bids, not catalog prices.

A curated library of successful, high-quality bids: real quantities, real unit costs, real crew productivity. The model reads your drawing set, takes off quantities by CSI division, and prices them against comparable jobs of the same type, size and region.

  • Quantities pulled from plan sheets, not assumed from square footage
  • Unit costs benchmarked to comparable bids that won
  • A confidence range on every total, so you know how hard to lean on it

The estimator

Every line reviewed by someone who has bid work.

Before an estimate is released, a working estimator checks the takeoff against the sheets, catches what the drawings don't say, and writes the assumptions and exclusions a GC would actually put in front of an owner.

  • Questions sent to your email when the set has gaps
  • Assumptions and exclusions written for the bid, not boilerplate
  • Sign-off on every line before you see it

What's in every estimate

Line items by CSI divisionQuantity, unit, unit cost and total for each item, from Division 01 through 33.
Markups shown, not buriedOverhead & profit, contingency, bond and insurance as separate lines you can adjust.
Assumptions & exclusionsWritten for this job, ready to paste into your proposal.
Confidence rangeHow far the total could move, based on the comparable bids it was priced against.
Bid-ready PDFClean and formatted for the owner or GC you're bidding to.
Editable spreadsheetEvery line as a CSV so you can plug in your own subs and numbers.

One flat price per estimate.

Pay when you submit. Every estimate includes the full line items, the PDF and the spreadsheet.

Starter

Up to $150K project value

$129per estimate
  • One revision
  • 3 business days after file confirmation
  • Full line-item estimate
  • PDF + spreadsheet
Start an estimate

General Contractor

$750K–$2M project value

$449per estimate
  • Unlimited revisions
  • 3 business days after file confirmation
  • Full line-item estimate
  • PDF + spreadsheet
Start an estimate

Choose the tier that matches your project's expected value. Rush turnaround (24 hours after file confirmation) is a flat $149 on any tier. Over $2M? Request a custom quote.

Ready to bid it?

Upload the set, tell us the job, and see where the number lands.

Start an estimate